Detailed Process for Connecting Stone and Wall Tiles

Sep 20, 2024

Leave a message

info-1080-710

Material Analysis:

Use 20mm marble and 12mm glazed ceramic tiles for the installation.

Marble installation can be done using ordinary Portland cement mixed with fine or coarse sand or with a specialized AB adhesive designed for stone.

For wall tiles, use ordinary Portland cement or adhesive. Stone surfaces require six-side protection to avoid damage.

For the finished surface, use a specialized joint filler for grouting, wiping the joints, and cleaning. Apply a protective film to protect the finished product.

 

info-1080-775

 

Detailed Procedure:

Preparation Work: Plan the site and ensure all necessary materials and tools are on hand.

Site Layout: Mark out the areas for installation to guide material placement.

Material Processing: Cut and shape materials as needed based on the design.

Substrate Treatment: Prepare the base layer to ensure it's even and ready for bonding.

Cement-Sand Combination Layer: Apply a layer of cement mixed with sand as the bonding agent.

AB Adhesive for Stone: Use specialized AB adhesive for fixing the marble.

Install Stone and Wall Tiles: Lay the stone and tiles according to the planned layout.

Grouting and Cleaning: Fill the joints with grout, wipe them clean, and ensure the surface is spotless.

Final Surface Treatment: Protect the finished surface with a specialized protective film to avoid damage during subsequent work or usage.

 

 

Send Inquiry
you dream it, we design it
We can create the bathroom
of your dreams
contact us